Delivery And Assembly Of Elements Of The Building Automation System (Bms) Along With Issuing Control Signals To The Target Bms System In Building B At Ul. Strzeszyńska 58 In Poznań And In The Hv/Mv Power Station Of Gpz Kuczyna