Execution Of Electrical (Gen.) Portion Of Work For 1. Proposal For Construction Of Long Loop Line At Slh On Up Side. 2. Construction Of Rub(Fhs) At Km 734/33-735/35A In Lieu Of Manned Level Crossing No. 373 (Belha Yard) Km. 734/25-27 Between Belha-Dagori Section In Howrah-Mumbai Main Line.