Preparation Of Design And Cost Estimate Documentation Along With Obtaining The Necessary Administrative Decisions For The Works Consisting In Changing The Location Of The Rail Level Crossing At The Mogilno Station, Between Platforms No. 2 And 3, With The Simultaneous Extension Of The Platform Edge Of Platform No. 3 From The Kołodziejewo Station Side.