Supply And Installation Of Secondary Energy Absorber Assembly To Rdso D Rg No.Rdso/Cg/Drg/24055, Alt-'2' Firm Shall Fulfil The Manufacturing Facility As Per Icf/M D/Spec-147, Issue Status-01 Rev.02 With Amendment No.01. In Addition Milling Machine Also Requ Ired. Special Condition : Suitable Packing To Be Done To Avoid Damage During Transit, Unloa Ding And Rust Prevention During Storage. - Item Sl No 7 & 9 Shall Be Procured From Make/Brand : 'Tvs' Or 'Unbrako'. - Painting Shall Be As Per Clause 15.2 Of Icf/Md/Spec-252, Rev-00, Amd-4 - Tight Ening Troque Value Shall Be 650 Nm. Installation Required Annexure 'A' Dated 13.09.2023 To Be Followed. [Safety Item] [ Warranty Period: 30 Months After The Date Of Delivery ] [Quantity Tolerance (+/-): 5 %Age , Item Category : Normal , Total Po Value Variation Permitt Ed: Max 8 Lacs ] ]