Provision for Construction works for a productive borehole (5 m³/h) equipped with a solar pumping system, featuring a 10,000-liter poly-tank water tower, a pumping and distribution network, and irrigation basins connected to the borehole within the market gardening area of Palembéra village / Commune of Tiankura