The Object Of The Contract Is The Execution Of The Works Corresponding To The Project, Which Is Based On The Separation Of The Two Areas In The Pool Bar, To Maintain An Access Area From The Outside, From Libertad Street, And Another Area From The Pool Area And At The Same Time That These Two Areas Can Be Connected At Any Time To Continue Maintaining A Single Area.