Lot-01 Sports Hall And Adjacent Outdoor Spaces; This Lot Is Broken Down In A Series Of Phases Until The Complete Completion Of The Sports Complex. (Phase 1 Consolidation Of The Site / Phase 2 Sports Hall / Phase 3 Urbanization Of The Site) Lot-02 Technical Ground (Floor Of The Pavilion Track); Which Includes Two Complementary And Autonomous Games, Which, On The One Hand, Improve And Complement The Court, And On The Other Hand Protect It From Specific Events Outside The Sports Field Lot-03 Equipment Of The Pavilion, That Is, The Technical Material Or Furniture That Complements And Equips The Equipment With The Autonomous Elements That Make It Suitable For Other Sports And Activities Lot-04 Adaptation Of Some Outdoor Paddle Courts, In The Public Space Of The Square, Which They Equip It With Complementary Equipment. In The Urbanization, Everything Is Already Ready For Installation, Both At The Base And Facilities Level. Lot-05 Urbanization Of The Access Street Section (Onze De Setembre Street). A Complementary And Independent Action From The Rest, Which Improves Access To The Sports Center.