Work To Secure Rainwater In The Bv 52 Watershed Design And Construction Of A Rainwater Retention Basin With A Capacity Of 3,800 M3 And A Lifting Station On Boulevard Surcouf With A Capacity Of 1. 4 M3/S And Including The Construction Of Pipes Upstream And Downstream Of The Works