Heating, Ventilation And Sanitary Installations: 4 Electric Radiators Ventilation Installations Of 450 M³/H Decentralized Domestic Hot Water Production (4) Set Of Regulation Equipment, Electrical Panels, Wiring Sanitary Appliances (Approx. 8 Devices) Special Equipment (Lift Pump) Pipes (360 M Distribution – 310 Wastewater) Fire Stations (Approx. 13) Start Of Work: September 2024 Duration Of Work: 200 Working Days