The Development Of A Secure Combined Passage At The Existing Crossroads On The Road To Thionville N3 (Rue Du Camping /Rue De Syren) Cr154. The Development Of 2 "Tray" Slowdowers With A Length Of 12M At The Ends Of The Existing Area 30 And The Implementation Of Suggestive Tracks On The Cr154 In Alzingen. The Development Of A Combined Passage The Exit From Hassel And Bus Stops Will Be Brought Up To Standards With Reduced Mobility. The Pc11 Will Be Developed Along The Cr162, Over A Length Of Around 130.00 Ml, On The South Side, Between The Exit From Hassel And The Existing Pc11. The Pilot Project Provides For The Speed Reduction On The Cr154 To 50 Km/H Between The Pr (0.50+118–3.50+490) Thus The Implementation Of 4 Constructive Provisions Allowing The Occasional Reduction In Automobile Speed And The Implementation Of A Colored Coating. The Treatment Of Contaminated Materials Of The Trunk As Well As The Implementation Of Recycled Materials.