Preparation Of Detailed Project Report (Dpr) For The Work Of Construction Of New Bridge Over River Mahananda With Both Side Approaches Besides (U/S Or D/S) The Existing Bridge (About 485.00 M) At Existing Ah02, Chainage 30.00Th Km (New Nh-10).