Removal Of Silt From Bed, Remove Garbage, Hyacinth, Slushy And Other Obstacles And Repair And Maintenance Of Khal For Secondery Drainage Canal-7 At (Sdc-7) Km. 0.000 To Km 2.000 = 2.000 Km, At (Sdc-8) Km. 0.000 To Km 3.800 = 3.800 Km In Connection...