The Object Of The Contract Is The Supply, Installation And Commissioning Of A Thick Solid Solid System At The Wastewater Swirpot Station From Merchandise From A Staircase Filter That Allows The Elimination Of Thick Solids As A Stage Prior To The Physical-Chemical Treatment Of The Installation Assembly.