Construction Of The Kolnik-Elbląg Gas Pipeline Together With The Infrastructure Necessary For Its Operation In The Pomeranian And Warmian-Masurian Voivodeship Implemented As Part Of The Project Entitled "Construction Kolnik Gas Pipeline- Elbląg With The Gasification Of The Vistula Spit "