The Project Concerns The Construction Of The Work Oa877 (101.25 M), As Well As The Deviation Of A Siden Discharge Conduct And The Realization Of Part Of The Current Section. Vertical Pile Drill: 490M Rippings: 480,000 Kg Sheets: 546,000 Kg Self -Supporting Predalles: 1850M2