Repairing Supplementary Medium Voltage Grid In 2025, Category: (1) 0.4Kv Line After The Tba: Dang Xa Pump, As Dang Xa, Steering Pump, Thi An, Pho, Manh - Long Hung Commune; (2) Line 22Kv Of Ai Quoc 1, Ai Quoc 2, Hoang Nong, Canh Nong, Pump No. 3 Diep Nong, Duyen Nong 2, Venu Yen 2 Lo 473E11.4; 22Kv Reward Branch 1, Bon Phuc 2 Lo 474E11.4