Sealed Quotation Are Invited For "Discontinuing The Lift For Cellar Floor (Reduction Of Lift Operation For Cellar Floor) Of The Existing Schindler Lifts Of 11 Stops (Cellar+Stilt+9 Floors) And Refixing And Installation Of Lifts In Operational For L0 Stops (Stilt+9 Floors) And Taking Up Comprehensive O&M For 3 Months For The Schindler Lifts (82 Nos) Installed At 2Bhk Housing Colony Ahmedguda, Keesara Mandal, Medchal Malkajgiri District"